    Energy glossary

    Terms around battery storage, grid connection and charging, explained plainly for companies planning storage or electric truck charging.

    B

    Behind-the-meter

    Storage system on the consumer’s side of the meter, that is on the company’s premises and part of the customer installation. It serves the site, for example for peak shaving, self-consumption or vehicle charging.

    The electricity stays within the customer’s installation and does not have to flow through the public grid. Examples are a storage system with photovoltaics on the factory roof or at a fleet’s charging site. Economic viability depends mainly on the company’s own electricity costs and load profile. The counterpart is front-of-the-meter.

    BESS (Battery Energy Storage System)

    Short for Battery Energy Storage System. It consists of battery cells, battery management, inverter and controls, often in a container. It takes in electricity when it is available or cheap and releases it when needed.

    Read more →

    C

    Charge cycle

    One full charge and discharge of a storage unit's usable capacity. Partial discharges add up: two discharges of 50 % count as one cycle. The number of cycles has a major influence on a battery's service life.

    The lower the depth of discharge per cycle, the more cycles a battery usually survives, and high temperatures accelerate ageing. In addition, a battery also ages with time, regardless of use. Manufacturers therefore state the cycle life, that is, the number of cycles until a defined residual capacity is reached. For the economics of a storage system it matters how often it is cycled per day.

    Charge Point Management System (CPMS)

    Software used to monitor, control and bill charging points. It usually communicates with the charging points through the OCPP protocol. Depending on the system, access management, status display and power limiting are included.

    The CPMS is the backend of a charging infrastructure and assigns each charging session to a person or a vehicle so that it can be billed. It detects faults and provides reports for the operator. When choosing one, it should support open standards, so that charging points from different manufacturers can be connected.

    Charge Point Operator (CPO)

    Operator of charging points. It is responsible for operation, including the connection to an IT backend, and bills the charging; it is often also the owner. For public charging points this is done towards drivers and contract partners, for depots towards the company itself or its customers.

    This includes maintenance and availability of the charging points; the IT backend is usually a CPMS. For public charging points the CPO works with providers of charging tariffs (EMPs), often via roaming platforms; at a company’s own depot this level usually does not apply. A company can act as CPO for its own charging points or hand the operation to a service provider.

    Charging load management

    Control of several charging points so that the available power at the grid connection is not exceeded. The power is distributed according to rules such as departure time, state of charge or priority.

    Read more →

    Charging strategy

    The rule by which storage or vehicles are charged and discharged. Examples: charging at low prices, with surplus solar power, as evenly as possible, or so that no load peaks occur. It depends on the goal (costs, self-consumption, grid connection) and on when the vehicles are in use.

    Read more →

    Consumption charge

    Price per kilowatt-hour actually drawn. Costs rise with consumption. It is separate from the demand charge, which depends on the highest power drawn.

    It is part of the supplier’s price as well as of the grid fees, which for large consumers consist of a consumption charge and a demand charge. With dynamic tariffs it follows the exchange price. Self-generated power and load shifting mainly affect the consumption charge, while load peaks affect the demand charge.

    D

    Demand charge

    Price component based on the highest power drawn in kW, not on the quantity in kWh. For large consumers it is usually part of the grid fees and is based on the annual peak load (highest 15-minute average); some grid operators also offer monthly billing. A single peak can therefore determine the costs of a whole year.

    As of: 25 Nov 2026. Under the Bundesnetzagentur’s draft, for consumers with an annual consumption above 100,000 kWh a capacity price on an ordered capacity is to replace the demand charge from 1 Jan 2029. Note: This is still a draft; the final ruling is still pending.

    Read more →

    Depot charging

    Charging vehicles at the company’s own yard or depot, usually overnight or during idle times. It is easy to plan because the vehicles return at known times. It requires a grid connection, charging points and controls that distribute the power across the vehicles.

    Read more →

    E

    Efficiency

    Ratio of usable output to energy input, in percent. For solar modules it is the share of sunlight converted into electricity. For storage it is the ratio of energy discharged to energy charged; some is lost as heat.

    For solar modules a higher value means more yield per area. For storage systems this is called the round-trip efficiency. Inverters, cables and temperature reduce the efficiency of the overall plant.

    Electricity tariff models

    Pricing models for electricity purchase, for example fixed price, dynamic tariffs linked to the exchange price, time-variable tariffs or tariffs with a demand charge. The model determines how load shifting and storage pay off.

    Time-variable tariffs have fixed prices by time of day, dynamic tariffs follow the exchange price, and tariffs with a demand charge exist for customers with load metering. With dynamic tariffs a storage system or flexible consumption pays off, because electricity can be bought in cheap hours and used in expensive ones. When comparing, it is not only prices per kWh that count, but also grid fees, levies and duties.

    Energy as a Service (EaaS)

    A model in which energy infrastructure such as storage, charging points or solar systems is used as a service instead of being purchased. The provider plans, finances, builds and operates the system. Billing is usage- or performance-based, for example monthly or per kWh.

    Read more →

    Energy management system (EMS)

    Records and controls generators, storage, loads and the grid connection of a site as a whole. Based on measurements, forecasts and prices it decides when to charge, discharge or shift load, and keeps to limits such as the connection capacity.

    Read more →

    Energy storage

    System that takes up energy, stores it temporarily and releases it later. For electricity these are mainly battery storage systems. Storage balances generation and consumption over time.

    There are also hydrogen storage, compressed-air storage and thermal storage. They differ in power, capacity, storage duration and efficiency. Companies mostly use battery storage, because it reacts quickly and can be expanded in modules.

    F

    Front-of-the-meter

    Storage system connected directly to the public grid on the grid side of the meter, serving the grid or the electricity market rather than supplying a single site. Typical applications are power trading and grid services such as balancing power.

    Such storage systems earn money through the market: by buying at low and selling at high prices and by services to the grid. The electricity flows through the public grid, which is why grid fees and connection conditions matter a lot for economic viability. The counterpart is behind-the-meter.

    Full feed-in

    Operating mode in which all the electricity generated is fed into the public grid and no self-consumption takes place.

    The plant is connected technically and legally so that no electricity flows into the company’s own building. The EEG pays a higher support rate for this than for surplus feed-in. A switch between the models is possible under certain conditions. Full feed-in often makes sense where hardly any electricity is needed at the site.

    G

    Grid expansion

    Expansion and reinforcement of the power grids (lines, substations, connections) so that more generation and consumption can be taken up, for example from renewables, e-mobility and heat pumps. It takes time and money. Storage and load management can reduce or delay the need at a single connection.

    Read more →

    Grid fee exemption for storage

    Rule under which electricity storage systems are exempt from grid fees to the extent that they draw electricity from the grid, store it and feed it back into the same grid with a time delay. It is based on Section 118(6) of the German Energy Industry Act (EnWG) and applies for 20 years from commissioning if the storage system goes into operation by 4 August 2029. For storage systems that also consume electricity on site, it applies proportionally. It is meant to prevent the same electricity from being charged grid fees twice, when stored and when later consumed.

    Commissioning is deemed to be the first draw of electricity for the trial operation; a completed grid connection alone is not enough. What is exempt are the grid fees, not levies, concession fees or metering charges.

    As of: 25 Nov 2026. Under the Bundesnetzagentur’s draft, the exemption remains for storage systems for which a final investment decision was taken before the ruling is announced (according to the draft on 1 Jan 2027) and which go into operation by 4 Aug 2029. For new storage systems without this protection, grid fees are planned from 2029. Note: This is still a draft; the final ruling is still pending.

    Grid feed-in

    Delivery of electricity from a plant into the public grid. Remuneration depends on the type of plant and the marketing form.

    Feed-in takes place via an inverter, and a meter records the quantity. Remuneration is under the EEG with a fixed feed-in tariff or through direct marketing, alternatively through a supply contract such as a PPA. The grid operator can limit feed-in when the grid reaches its limits (feed-in management).

    Grid fees

    Fees for using the power grid. They cover construction, operation and maintenance of the grids and make up a significant share of electricity costs. For large consumers they usually consist of a consumption charge and a demand charge; the level depends on the grid operator and voltage level.

    As of: 25 Nov 2026. The Electricity Grid Fee Ordinance expires at the end of 2028. From 1 Jan 2029 a new grid fee system of the Bundesnetzagentur (AgNes procedure) is to apply. Note: This is still a draft; the final ruling is still pending.

    Read more →

    I

    Inverter

    Converts direct current (DC) from solar modules or batteries into alternating current (AC) that is fed into the grid or used by consumers. In storage systems, inverters work in both directions.

    Modern inverters also take on tasks for grid operation, such as grid monitoring and limiting feed-in, and communicate with an energy management system. Hybrid inverters combine photovoltaics and storage in one device. Important selection criteria are power, efficiency, compatibility and interfaces.

    P

    Partial feed-in

    Operating mode of a photovoltaic system in which part of the power is used on site and only the surplus is fed into the grid. The counterpart is full feed-in.

    The surplus is remunerated under the EEG (surplus feed-in). Because electricity on site is often worth more than the feed-in tariff, partial feed-in is often the more economical model for companies with self-consumption.

    Peak shaving

    Short-term peaks in power draw are absorbed by a storage unit or by shifting load. The highest power drawn falls, and with it the demand charge.

    As of: 25 Nov 2026. The benefit of peak shaving depends on the price model. Under the Bundesnetzagentur’s draft, a capacity price is to replace the demand charge for larger consumers from 1 Jan 2029 (see demand charge). Note: This is still a draft; the final ruling is still pending.

    Read more →

    Photovoltaics (PV)

    Conversion of sunlight into electricity using solar cells. Several cells form a module, several modules a system. Output is stated in kilowatt-peak (kWp).

    Solar cells generate direct current, which an inverter converts into alternating current. The actual yield in kWh depends on location, orientation, shading and weather. In companies, plants are mostly installed on factory roofs or open land.

    Power Purchase Agreement (PPA)

    Long-term electricity supply contract between a generator and a buyer at a fixed price or according to a price formula. A distinction is made between on-site and off-site PPAs.

    The generator receives stable income over the term, the buyer a predictable electricity price. With an on-site PPA the plant is located on the buyer’s premises and supplies directly; with an off-site PPA the electricity is delivered on paper through the public grid. Price and volume, for example a fixed quantity, a share of demand or the quantity produced, are set by contract.

    Power trading

    Buying and selling electricity on exchanges or bilaterally, for example on the futures, day-ahead or intraday market. Prices form through supply and demand and fluctuate strongly. Storage can exploit price differences by charging at low prices and discharging at high ones.

    Day-ahead trading relates to the following day, intraday trading runs until shortly before delivery. In addition there is balancing power, with which grid operators compensate fluctuations; a storage system can offer it in addition to arbitrage. Trading usually runs through a direct marketer or trading partner who handles market access and settlement.

    S

    Self-consumption optimization

    The aim is to use as much self-generated power, usually from photovoltaics, directly on site instead of feeding it into the grid. Storage and controls shift consumption and charging to times of high generation. This reduces the power drawn from the grid.

    Read more →

    Solar capacity

    Installed output of solar systems, usually in kWp or MWp under standard test conditions. It is not the energy actually produced: the yield in kWh depends on location, orientation, weather and season.

    The annual yield is described by the specific yield in kWh per kWp, which varies with location and orientation. For planning, the solar capacity is the reference for yield, grid connection, economic viability and the sizing of a storage system.

    T

    Total cost of ownership (TCO)

    Total cost of a vehicle or system over its entire period of use: purchase or lease, energy, maintenance, taxes and tolls, infrastructure and residual value. When comparing electric and diesel trucks, the TCO is usually considered, not the purchase price alone.

    Read more →

    V

    Virtual Power Plant (VPP)

    A pooling of many decentralised systems (generators, storage, controllable loads) through software that acts like a single power plant on the electricity market. The systems are controlled in a coordinated way to market power or provide grid services.

    Read more →