What is a BESS?
A Battery Energy Storage System, or BESS for short, stores electricity directly on site and makes it available again when needed. It reduces load peaks (peak shaving) and provides additional power that the existing grid connection cannot supply on its own. The technology suits charging infrastructure, industrial sites and standalone storage projects.
What can be done if the grid connection is not sufficient for electric trucks?
If the connection is not sufficient for the planned fleet, operation does not have to wait for the grid operator’s grid expansion. A battery storage system (BESS) charges in times of low energy demand and releases the energy at high power as soon as the trucks or the site need it. Charging load management distributes the available power across the vehicles. Operation can therefore start with the existing grid connection while a possible expansion is planned in parallel.
How can electricity costs in a business be reduced?
Besides the price of the energy consumed (consumption charge), load peaks determine a large part of the costs in many businesses, because the demand charge and grid fees depend on the highest power. A storage system with controls cuts these peaks (peak shaving). Anyone with photovoltaics can also increase self-consumption (self-consumption optimization). Which measure pays off is shown by the load profile of the site.
What does a battery storage system cost, and how does financing work?
The costs depend on power, capacity, site and connection conditions, so there is no flat price. There are purchase, leasing and Energy as a Service models: a purchase requires an investment, while with leasing and Energy as a Service there is nothing to pay upfront. Who owns the system depends on the model chosen. A concrete offer follows after the site analysis.
Which BESS models does Delta Charge offer?
The systems range from complete, turnkey depot solutions with charging infrastructure and standalone storage for companies to grid-connected large-scale storage for participation in the energy market (power trading).
Why does the system need intelligent control?
Only the software connects all components into an efficient overall system. The energy management system (EMS) decides in real time when power is charged, stored, consumed or marketed.
Is there funding for battery storage and electric truck charging infrastructure?
Funding programmes for storage, charging infrastructure and electric vehicles change often and differ by type of business and region. Delta Charge keeps customers informed about regulatory changes and current funding windows that affect project economics.
Who operates and maintains the system after commissioning?
Delta Charge remains responsible as owner and operator: monitoring around the clock, energy optimisation and maintenance are part of operation. There is one contract and one point of accountability.
Can an existing solar system be integrated?
As a rule, yes. The system stores surplus solar power and releases it when the site needs it (self-consumption optimization). What is possible in an individual case is clarified in the site analysis.
Ready to electrify your site?